Oriental Star search and rescue scene rescue personnel protection is appropriate

The Oriental Star weighed on everyone's hearts. The hardest part was the staff who participated in the rescue at the scene. After the hull was lifted, rescue workers entered the boat to clean it up. Since the interior was very cluttered when entering the cabin, many search and rescue personnel were In the course of work, he was stabbed by iron nails and broken planks. He had broken the blood and had to break the needle.

It is reported that rescue personnel entered the cabin from 22 o'clock on the 5th, and continued to work until 19 o'clock on the 6th, was weighed a few dozen kilograms of heavy disinfection equipment, for the victim's body and search and rescue personnel epidemic prevention and disinfection. Many search and rescue personnel working on-site were continuously fighting for more than twenty hours. The clothes in the chemical protection suits were wet and dry. They could only drool in search and rescue clearance and rested on the railings or on the stairs. Immediately after the search and rescue.

From this it can be seen that all search and rescue workers are "fully armed" on the scene and are dressed in Siamese white chemical protective clothing, rubber boots, rubber gloves, helmets and double-layer masks. Whether or not to wear safety shoes is not yet known. However, under such circumstances, we should anticipate the situation in the cabin, provide maximum protection for rescue workers, and provide a full range of labor insurance products to ensure the safety of the rescue work. . It is also responsible for the respect and responsibility of the people involved in search and rescue. Doing the necessary security protection is willing to make less disaster, and the dead rest in peace!

Copyright Statement: This article is an original website reporter's article. If you need to reprint please indicate the source.

Link address: http://


Geo-membrane is produced by a method of three layer co-extrusion model.  The raw material is processed at 200°C by fusing and coextrusion, whose basic properties are kept during the producing process. 

Features: 

1)  Can bear chemical erosion. 
2)  A wider using temperature range and a longer using life. 

Application: 

It can be widely used in areas of garbage burying,  waste disposal,  tail minerals storage and underground construction projects.  

Hdpe Geomembrane

High Density Polyethylene Geomembrane, Hdpe Geomembrane Smooth And Textured, Hdpe Geomembrane Polyethylene

Feicheng Lianyi Engineering Plastics Co., Ltd , https://www.lianyigeosynthetics.com