How about the assembly process of cabinet cabinets?

The whole kitchen cabinets in modern kitchens are generally on-site production and processing. Generally, there are three major components such as cabinets, wall cabinets, cabinet countertops, etc., and the cabinets need to pay attention to more matters during construction because it Need to consider its load-bearing factors, how about the cabinet cabinet assembly process? Xiaobian suggested that you still have to pay attention to the cabinet cabinet installation steps and skills to analyze and consider.

The assembly steps of cabinet cabinets mainly include:

1. According to the installation position of the fan, determine the hardware model and the direction of the split fan. Generally, the right fan in the opening direction should be used as the cover fan.

2. Check the size of the frame: the height of the frame should be measured at both ends; the width of the frame should be at the top, middle and bottom of the frame, and the corresponding part of the fan should be marked.

3. According to the scribing, the frame fan will be trimmed for the first time, so that the frame and the fan are suitable for the seam. The test and the second planing line are prepared. At the same time, the position of the frame and the fan hinge groove is drawn, and the scribing is avoided. Raise your head up and down.

4, shovel, picking page slot installation hinge: According to the hinge position of the mark, use the flat shovel to cut out the hinge edge, you can pick up the page slot.

5. Installation: When installing, the hinge should be pressed into the hinge slot of the fan first, and the fixing screw should be tightened. The depth of the groove should be adjusted during the trial installation. Adjust the gap of the frame fan and each hinge on the frame. Screw one screw first, then close it. The inspection frame and the fan are flat and free of defects. After meeting the requirements, tighten all the screws. Wood screws should be nailed into the full length 1/3, screwed into 2/3. If the frame or fan is yellow bud or other hardwood, the hinge mounting screws should be positioned and the hole diameter is 0.9 times the diameter of the wood screw, and the depth of the eye is 2/3 length of the screw.

6. Install the split fan: firstly measure the size of the frame and the fan, determine the middle seam and the depth of the cut, and plan the groove after the line. When the test is suitable, install the left fan first and then install the cover fan.

Since the installation requirements of the cabinet ceiling are very professional, it is recommended that the owner choose the cabinet company with good reputation and brand strength to purchase the products. They usually have a professional technical team to provide on-site installation services to ensure your home. Cabinet cabinet installation quality.

Global hardware network

Concerned about surprises

Label: How is the assembly process of cabinet cabinets?

Previous: Home integration, rational use of living space Next: What color is better for bathroom wall tiles?

Aluminum Circle For Utensil

1050 Spinning Treatment Aluminum Circle,Competitive Price Aluminium Circles,Kitchen Pot And Pan Sets

Henan Everwin Trade Co., Ltd. , https://www.ewaluminium.com