To decorate without leaving regret to give the house a physical examination

After entering the room, it will enter the process of decoration. But before this, it is best to do a physical examination of the house first, to see if the decoration effect is perfect, there are some quality mistakes. The following are some of the acceptance standards provided by experts.

Whether the doors and windows are defective

First check the wood material of the wooden door frame to see if there are major defects. If there is no big flaw, it will not be easily broken, and the window frame and door frame will not be deformed. Whether the material can reach a certain strength, can meet the requirements for closeness. Whether there are cracks on the wall surface, whether the verticality and flatness are up to standard, and whether there are cracks and empty drums on the wall and ceiling surface mortar, whether the yin and yang angles are vertical or not, and whether the size of the reserved door hole meets the standards.

The installation quality of the outer window is qualified. Test the switch outside the window, splash water to the outer window, check whether there is water leakage; form up and down is horizontal, right and left are vertical, the installation is solid. At the same time, it must be checked whether the switch of the door and window is convenient, sensitive, and anti-theft capability. These are related to the future peace and security of a family. If a problem arises, it can be negotiated with the developer to resolve and reduce the owner's responsibility and economic losses.

"Listen" whether the light partition can meet the standard

This item is aimed at whether the sound insulation effect of lightweight wall can meet the standard, whether the installation is firm, and whether there is empty drum phenomenon. The purpose is to find and solve the problems of sound insulation and poor insulation before the renovation. If one owner was too negligent before renovating, he would find that his house was very poorly soundproofed and his conversation was not private. For this reason, the family was very upset and had to re-do the soundproof wall.

"Q" The waterproof structure is reasonable or not

The problem of the waterproof structure of the rough house is mainly in the bathroom. Under normal circumstances, developers have done a waterproof treatment, finished product housing has been done by the construction unit polyurethane waterproof layer, due to the polyurethane waterproof layer is completed, often when installing other equipment, to destroy this waterproof layer or some polyurethane waterproof The quality is not critical, and the bathroom wall waterproofing layer used as a bathroom should have a height of at least 1.8 meters. Therefore, we recommend that the owners do a waterproof layer during the renovation phase. After the completion of the waterproof layer treatment, it is recommended to do a closed water test to see if there is any leakage.

"Cut" Whether the hydropower heating package is in place

According to the regulations, water, electricity, heating, and gas should be opened when the new house is accepted for delivery. However, it is not always possible to meet the requirements. Therefore, the factors of these facilities and equipment should also be taken into account in the renovation. If there are cold water pipes, it is generally necessary to check the condition of the water pipes on the wall, whether there is skew or blockage or leakage; open each spout to see if the water flow is sufficient and the water supply pressure is not enough, and the drainage is unobstructed; the heating equipment is installed Whether the position is reasonable, whether the interface is leaky, whether the components are complete, whether the pressure test is performed, and what is the situation; use an electric pen to test whether the power socket is powered on, if there is a light, you can turn on the light to see if the light is shining or not. Is it sensitive, safe and reliable? After these details have been checked, there is no problem and the decoration can be started. On the contrary, it is necessary to negotiate with the developer, and it is not too late to solve it completely.

Entrance decoration restaurant decoration window switch house decoration house home decoration bathroom waterproof bathroom door size bathroom door bathroom size bathroom leak