Circuit construction process

>>> Links: Circuit Debugging Knowledge

Process flow <br>Determine the position of the line terminal socket → The wall shows the exact position and size → The nearest similar socket leads

Construction points
1. If the socket is in the upper part of the wall, slot vertically upwards in the wall, and install the decorative line to the top of the wall;
2. If it is at the bottom of the wall, slot straight down to the bottom of the skirting board.
3. The groove depth should be the same, the groove line should be straight and the straight line should be erected. After the control line is ejected on the wall surface, the wall surface is cut with a marble machine and manually grooved.
4. The line must be sheathed when installing the circuit. The connection of the casing should be tight and smooth. Cut off the inside of the corner at the corners of the right angle. After cutting the arc-shaped interface on one side of the incision, bend and install.
5. After the conductors are installed in the casing, the conductor fixing clips shall be used. After the conductors are fixed in the wall and the wall surface, the plastering shall be concealed or covered with skirting boards or decorative corners.